ADR 0085 — Role flow as a declarative registry (fluxo.yml)

Status​

Proposed

Context​

The product holds three truths about the agent team in three places: the catalog (agent-areas.ts, single source, PHASE 18), the control (docs/gates.yml, ADR 0054), and the RELATIONSHIPS — who delivers what to whom — which only exist implicitly in prompts, use cases, and the ADR history. An implicit relationship is neither auditable nor measurable. The team model designed in Aug/2026 (market-profession map → agents) produced this third piece with nowhere to live, and auditing it against the product diverged on exactly four points for lack of it.

Decision​

docs/fluxo.yml, versioned, segmented by layer, with per-role contracts: mission, typed inputs/outputs (artifact + origin/destination + via), exit gate referencing gates.yml, status (active|planned|proposto|em-refinamento) and declared absorptions. Rules:

  • A proposto role DECLARES who absorbs it today and the objective criterion for separation — the target org chart becomes an activation sequence, never an aspiration.
  • A role that references a gate missing from gates.yml fails the test; an active gate with no owning role fails too.
  • An em-refinamento role keeps its code untouched and drops out of the formal flow; the pending items the suspension creates are declared in the file itself.
  • A relationship with lacuna status is trackable backlog, never a promise.

Alternatives considered​

  • Keep it implicit: rejected — it was the absence of this piece that made the audit diverge from the product.
  • Merge with gates.yml: rejected — control and relationship change for different reasons (ADR 0054 declares locks; this one declares contracts).
  • Register only active roles: rejected — without the proposto ones and their criteria, every new capability would rediscover the model from scratch.

Consequences​

  • Activating Staff/Platform and the proposed gates (necessidade-validada, adr-aprovado, implementavel, prototipo-validado) becomes a data change + its own ADR.
  • Psychologist/Anamnese under refinement are left with visible pending items (author of the cap proposal RN-086; the Staff's trigger).
  • The trigger table in modelo-de-time.md is the roadmap for future waves: each trigger fires the separation of the corresponding role.

References​

ADR 0038, 0053, 0054; RN-083/086/087; PHASE 15/18.